Recent drywall work in Kitchener-Waterloo

Fourteen jobs, filmed on our own sites.

5.0 from 41 Google reviews

A bathroom wall at Project Puslinch with insulation in and no board yetThe same wall boarded and taped Insulated Taped Project Puslinch

Same wall, two visits. Drag the line.

  • 20+ years taping: Alex Petkovich, owner
  • 5.0 from 41 Google reviews
  • 15,000+ sq ft of drywall at Project Short
  • 2016 founded in Kitchener

Under way now

Two builds on the go

Uptown Waterloo ·

Project Short

“A massive home addition and full redesign on Short Street in Uptown Waterloo, and right now it’s all studs, sheathing and potential.”
  • 15,000+ sq ft of drywall going up
  • 3 trades insulation, drywall and taping
  • Phase 1 studs and sheathing

Alex’s favourite details so far

  • The great room
  • High ceilings across the main floor
  • Reveal lighting around the doorways and baseboards (this is where a Level 5 finish really shows)

Holstein, Ontario ·

Project Holstein

How this one is being built

01

Resilient channel on the ceilings

“The ceilings got resilient channel first. It holds the board off the framing, so less sound travels between rooms.”

02

Butt board behind the seams

“Butt board goes behind the short-end seams so they finish flat. That matters in rooms like these, where big windows throw side light across every wall.”

03

Glue on the board

“Tytan glue on the board helps cut down on screw pops and vibration transfer.”

Have a build like this? Send drawings for a quote

5.0 from 41 Google reviews

What builders say about the finish

Adam Cochrane · Google review

“As a general contractor, finding a drywall company you can rely on is extremely important, and LVL5 Drywall Services has consistently delivered.”

Lisa Kurtz · Google review

“Alex and his team have done a few projects for us at Kurtz Construction and we are happy to work with them as one of our trusted sub-trades.”

Angelo Graci · Google review

“The finish they left was nothing short of remarkable.”

Project Puslinch · Bathroom ·

One wall, three visits

Same doorway every time. The slider at the top of the page is this wall.

The Project Puslinch bathroom wall with insulation in and no board yet
01 Insulated
The same wall with green moisture board hung
02 Boarded
The same wall with every joint and screw taped
03 Taped
  1. 01

    Insulated

    “Keeping the bathroom quiet”
  2. 02

    Boarded

    “Progress Report”
  3. 03

    Taped

    “That's a wrap at Project Puslinch!”

Get a quote for boarding and taping

Project Deer Ridge · Kitchener ·

A textured ceiling, trowelled smooth

The reel shows the ceiling before, the coats going on by hand, and the same room after.

A taper in an LVL5 shirt mixing compound at Project Deer Ridge
Mixing on site
The same taper trowelling compound across the ceiling
Coating the ceiling by hand

Have a textured ceiling? Get a quote

Custom finishing · Kitchener-Waterloo ·

The curved fireplace

“Those curves though!”
“From boarding to taping, every detail was dialled in to get that clean, polished finish.”

Planning a feature wall? Get a quote

More drywall and taping jobs

Project Manresa

“This one is definitely one I'll always remember it was an absolute honor to be a part of the project.”

Kitchener ·

Project Inadale

“We are very happy how this one came together!”

Waterloo ·

Project Roosevelt

Taped, then painted.

A large room at Project Roosevelt boarded and taped, with a coffered ceiling
Taped The main room
An arched niche at Project Roosevelt, taped
Taped The arched niche
A room at Project Roosevelt painted white with flooring going in
Painted Flooring going in
A suspended ceiling grid part filled with tiles in a commercial unit, crew working at the far end

Commercial ·

Drop ceiling install

“Enjoying the process and feeling blessed to be able to work with the people I do.”
A basement hall at Project Rose St, taped and cleaned up

Kitchener ·

Project Rose St

A taped room with two windows at Project Dekay

Kitchener ·

Project Dekay

A taped basement room at Project New Castle

Project New Castle

“Dusted and ready for prime”
A taped room with a coffered ceiling at Project Medford

Project Medford

Boarded, taped and wrapped.

A taped room with a row of windows, floors scraped clean

Uptown Waterloo ·

Prep to final product

“Sanded, scraped, and thoroughly vacuumed.”

Get a drywall quote

Have drawings or site photos?

Send them with your quote request, or call and talk the job through.

Monday to Saturday, 7 am to 5 pm.

A crew member in an LVL5 cap and shirt on site at Project Inadale